| 3/12/01 - I spent the winter months building cabinets in the garage, and then rushed to get enough sheetrock done and install the cabinets so the floor could be laid. Roberto Zamora, an amazing tile guy spent three weeks putting down the travertine stone and talavera tile floor. He also helped us with the design.
The other pano of this floor is much bigger (2.6mb), but you can really zoom in on the details. |
||||